Estimate concrete volume for slabs, footings, beams and similar elements, then review the formula, a worked example and practical quantity-takeoff notes.

Concrete volumeWaste allowanceWorked exampleMobile friendly
← All Calculators

Concrete Calculator

Calculates net concrete volume and order quantity including waste for foundations, slabs, columns, beams and walls.

Unit System

How much concrete should you order?

A concrete takeoff starts with the net geometric volume, but the quantity ordered on site is often slightly higher. Form tolerances, uneven subgrade, concrete left in the pump line, spillage and dimensional uncertainty can create additional demand. CivilCalc shows both net volume and an estimated order quantity after the selected waste allowance.

Content and method reviewed: 19 September 2026

Concrete volume formula

For a rectangular element, multiply length, width and thickness. Calculate foundations, slabs, columns, beams and walls separately when that makes the takeoff easier to audit.

Vnet = L × W × H
Vorder = Vnet × (1 + waste/100)

Jobsite worked example

A 60 ft × 40 ft mat foundation at 12 in thickness has a net volume of about 88.89 yd³. With 5% allowance, the planning quantity is about 93.33 yd³. Final ordering should also consider supplier increments, truck capacity and pour sequencing.

How to choose a concrete waste allowance

Waste is not one universal percentage. These ranges are planning references, not contractual measurement rules.

Site / placement conditionTypical planning rangePractical note
Regular forms, repetitive geometry2–3%A lower allowance may be reasonable when dimensions and formwork are well controlled.
Typical slabs, beams and footings3–5%Common preliminary range for ordinary takeoff and ordering.
Uneven subgrade / complex geometry5–7%Excavation tolerance and irregular shape can increase actual volume.
Uncertain conditions / small fragmented pours7–10%+Do not apply a high allowance automatically; identify the source of uncertainty.

Keep contractual quantity measurement and practical ready-mix ordering as separate decisions when the project rules require it.

Concrete takeoff examples by structural element

ElementExample dimensionsNet volumeOrder with 5%
Mat foundation60 × 40 × 1.0 ft88.89 yd³93.33 yd³
Slab30 × 20 × 6 in11.11 yd³11.67 yd³
8 columns16 × 16 in × 10 ft3.95 yd³4.15 yd³
4 beams12 × 24 in × 20 ft4.44 yd³4.67 yd³
Wall25 ft × 10 in × 10 ft7.72 yd³8.10 yd³

6 checks before ordering ready-mix concrete

1. Drawing dimensionsVerify dimensions and thicknesses against the current construction drawings.
2. OpeningsReview major blockouts, penetrations and volumes that will not be poured.
3. Forms and subgradeCheck whether excavation or form tolerances can add volume, especially for foundations.
4. Pour sequenceSplit total volume into pours that match pump, crew and supply capacity.
5. Concrete mixKeep quantities separate when elements require different strength classes or mix properties.
6. Order incrementsConsider supplier increments, truck capacity and the plan for the final partial load.

Frequently asked questions

How much extra concrete should I order?

Calculate net geometric volume first, then apply an allowance appropriate to the site and geometry. Confirm the final order with the supplier and pour plan.

Is 5% concrete waste always appropriate?

No. Regular formed work may justify less, while uneven subgrade or complex geometry may require more. The allowance should reflect actual project conditions.

Should rebar volume be deducted from concrete quantity?

It is commonly not deducted for a preliminary concrete takeoff. Contract measurement rules or authority specifications may require a different approach.

Can I combine footing, column and beam quantities?

Yes. Calculate each group separately and add the volumes, but keep quantities separate when different concrete mixes or placement stages are required.